Skip to product information
Mini Magnetic GPS Tracker – Real-Time Location Device - My Store

Mini Magnetic GPS Tracker – Real-Time Location Device

$39.99

Estimated Delivery Times

🇦🇺 Australia: 3-9 days

🌍 US/UK/CA/NZ: 7-28 days

Peace of mind, magnetically attached.
The GF10 Mini GPS Tracker is a compact, all-in-one solution for monitoring vehicles, equipment, and other important assets in real time. Its powerful magnetic casing and ultra-compact design (just 41mm) allow it to attach securely to vehicles, sit in bags, or slip into a wallet, providing real-time location tracking in a compact form.

Real-time alerts, historical insights.
Set up a virtual safety fence and receive instant notifications if your tracker moves beyond your designated zone. With unlimited 180-day track replay, you can review the complete movement history of anything you value, from a parked car to a wandering pet, directly from your smartphone.

Protect what matters most.
From securing vehicles against theft to monitoring valuable equipment or adventurous pets, this versatile device provides dependable location tracking when you need it most. Its long-lasting battery and universal 2G network compatibility ensure dependable performance wherever you go.

Advantages:

✔ Compact & Magnetic – The tiny, lightweight design with a strong magnetic back attaches securely to any metal surface, making it ideal for placement on cars, scooters, or inside equipment.

✔ Real-Time Location & Alerts – Track movements live on your phone and receive instant alerts when the tracker enters or leaves a pre-set safety zone.

✔ 180-Day Journey Replay – Review the complete travel history of the tracker for up to six months, providing invaluable insights and security records.

✔ All-Day Battery Life – Engineered for endurance with efficient power management, supporting extended tracking on a single charge via the included USB cable.

✔ Universal Compatibility – Works anywhere with standard 2G network coverage. (Please ensure your SIM card supports 2G networks before use).

What’s included:

1 x Mini GPS Tracker

1 x Charging Cable

1 x User Manual

✔ The Verveana Assurance

Your satisfaction is our priority. If you are not completely happy with your product, we will provide a refund or replacement in accordance with our return policy.

✔ Curated Quality & Complimentary Shipping

Every item is reviewed to meet our quality standards before shipping. We then deliver this curated quality to you with complimentary free shipping.

Satisfaction Beyond the Purchase

Your journey with us is our priority. We are committed to your complete and lasting satisfaction.

Secure & Reliable Delivery

Your order is processed and shipped with secure packaging. Your order will be carefully packaged and delivered right to your door.

Australia-Based Customer Support

Our dedicated customer service team is here for you. Reach out anytime for assistance.